Cookies required for the proper display and operation of the website.
LK 276 Strzelin - Kamieniec Ząbkowicki
Two railway viaducts at km 69.323 and 69.547. Each structure consisted of prefabricated elements of the ABM FRAME system. Prefabricated retaining walls over 5 m high were used.
- km 69+323, km 69+547:
- Type of construction: ABM FRAME
- Type: Railway/Road
- Assembly time:1,5 dnia / obiekt
- Horizontal light:4,5 m
- Length:10 m