Cookies required for the proper display and operation of the website.
LK 33 Kutno - Brodnica
A two-span railway bridge made of prefabricated beams, side walls and centre walls of the ABM FRAME system. In addition to standard elements, a prefabricated flange was also used.
- km 29+684:
- Type of construction: ABM FRAME
- Type: Railway
- Assembly time:1 dzień
- Horizontal light:2 x 8,5 m
- Length:7,9 m