Cookies required for the proper display and operation of the website.
LK 31 Czeremcha - Hajnówka
Two railway bridges at km 107+884 and 118+079. Each structure consisted of prefabricated elements of the ABM FRAME system. Prefabricated retaining walls over 5 m high were used.
- km 107+884, km 118+079:
- Type of construction: ABM FRAME
- Type: Railway/Road
- Assembly time:2 dni / obiekt
- Horizontal light:7,5-10,0
- Length:5 m