LK 93 Trzebinia - Oświęcim

Four railway viaducts consist of prefabricated ABM FRAME system elements, and one structure consists of ABM ARCH elements and prefabricated retaining walls. All structures have been adapted for half-assembly while maintaining railway traffic on one of the tracks.

  • km 16+353, km 21+203, km 4+536, km 6+932:
  • Type of construction: ABM FRAME
  • Type: Railway
  • Assembly time:2 dni / obiekt
  • Horizontal light:12,5 – 13,5 m
  • Length: 10 - 11,5 m
  • km 2+685:
  • Type of construction: ABM ARCH
  • Type: Railway
  • Assembly time:2 dni
  • Horizontal light:6,5 m
  • Length:32,6 m
Download the property card

Location of the facility

Railway:
Road:
Type of construction:
ABM ARCH
ABM FRAME
ABM TWIN WING
+48 787 628 402
mosty@abmeurope.com