Połączenie Portu Lotniczego z Portem Morskim Gdańsk - Trasa Słowackiego
The TP-2 pedestrian tunnel consists of prefabricated arches and side walls from the ABM ARCH system. The outer top elements were adapted to the construction of a monolithic retaining wall on site. The TP-2 structure was assembled on a small construction site around the building under construction in adverse weather conditions, including temperatures reaching -25°C and heavy snowfall.
- TP-2:
- Type of construction: ABM ARCH
- Type: Road
- Assembly time:4 dni
- Horizontal light:19,84 m
- Length:37,63 m