S11 Koszalin - Bobolice

Two ecological viaducts WE-41 and WE-45.7. The first four-span, fully prefabricated ecological viaducts in Poland. The structures were made of prefabricated arches, side walls and openwork central walls of the ABM ARCH system.

  • WE-41, WE-45.7:
  • Type of construction: ABM ARCH
  • Type: Road
  • Assembly time:13-14 dni / obiekt
  • Horizontal light:szerokość: 47,2 - 50,4 m
  • Length:50 m
Download the property card

Location of the facility

Railway:
Road:
Type of construction:
ABM ARCH
ABM FRAME
ABM TWIN WING
+48 787 628 402
mosty@abmeurope.com