Cookies required for the proper display and operation of the website.
S7 Płońsk - Czosnów
Two road viaducts, WS-5 and WS-10. Each structure consisted of prefabricated elements of the ABM FRAME system. Prefabricated retaining walls over 7 metres high were used.
- WS-5, WS-10:
- Type of construction: ABM FRAME
- Type: Railway/Road
- Assembly time:7 dni / obiekt
- Horizontal light:11,8 -13,3 m
- Length:33,8 m - 39,1 m