S7 Płońsk - Czosnów

Two road viaducts, WS-5 and WS-10. Each structure consisted of prefabricated elements of the ABM FRAME system. Prefabricated retaining walls over 7 metres high were used.

  • WS-5, WS-10:
  • Type of construction: ABM FRAME
  • Type: Railway/Road
  • Assembly time:7 dni / obiekt
  • Horizontal light:11,8 -13,3 m
  • Length:33,8 m - 39,1 m